Project Apple faced significant challenges with water ingress on plant room walls, as well as concrete repairs on columns and soffits, which affected multiple areas around the development. Ronacrete were contacted to investigate and provide robust solutions.
1. Investigation and Assessment: The Ronacrete Technical team assisted with inspecting the affected areas to identify the source of the issues.
2. Material Selection:
Following the investigation and assessment, Ronacrete products were specified to meet each element of the repair work that was required.
3. Preparation:
Step-by-step guidance was provided for each element of the repair, covering the preparation and application of the specified products.
4. Follow Up:
Additional visits were made to monitor progress and ensure that the application guidelines were followed to achieve the required outcomes.
To investigate and outline the necessary procedures and materials for concrete repairs and corrosion protection in a variety of structural elements.
Block C Ground Floor Soffits:
Removal of woodwool slabs, concrete preparation, and application of RonaBond Anti-Carbonation Coating WB for corrosion protection.
Internal Columns:
Grit blasting is used to remove existing coatings, followed by the application of RonaBond HB45 for repairs, and then corrosion protection measures are implemented.
External Columns:
Preparation of surfaces through grit blasting and the application of RonaFloor Matt Floor & Wall Sealer WB to enhance water repellency and frost resistance.
Plant Room Walls: Investigation of dampness sources, removal of affected plaster, and application of Ronafix Pre-packed Tanking Render for effective tanking.
Addressing the source of dampness required a careful investigation and potential remediation work before applying the tanking system.
The existing plaster was extensively damaged, necessitating thorough removal and preparation, which prolonged the timeline.
Ensuring ideal curing conditions in an uncontrolled environment was challenging, prompting enhanced focus on sealing exposed surfaces during the curing period.
Areas requiring structural concrete repairs require remediation and preparation prior to the application of repair products and anti-carbonation coatings to ensure a durable repair.
The specified systems were successfully implemented, effectively mitigating water ingress in the plant room.
Follow-up assessments showed a significant reduction in moisture levels, improving the overall conditions within the area.
The soffits and columns were repaired to specification, as were all of the structural concrete repairs.
The project was completed within the stipulated timeframe and budget, and the client was delighted with the outcomes and the support from the Ronacrete team.
Project Apple, Windlesham, illustrated the importance of proper investigation and preparation, with the professional execution of the specified material. This, combined with Ronacrete’s technical expertise and wide range of professional products, resulted in durable and effective repairs throughout the site.
This case serves as an excellent reference for similar future projects that require effective solutions to mitigate dampness and moisture ingress, as well as structural concrete repairs to the highest standards, with a comprehensive range of solutions to meet the client’s needs. Ronacrete is your partner of choice.
We are a family-run business that has been in operation since 1969. For over 55 years, we have manufactured professional construction products and resin-bound materials.
Our formulations are unique to us, and all raw materials and finished products undergo thorough quality control checks at our laboratories in the UK.
Our technical team have expertise that spans over 50 years and are able to offer solutions and support to ensure that your projects are completed on time and on budget to the highest specifications.
Be Ready For Anything With Ronacrete